January 16 to 31

NATIONAL AMERICAN HUEY HISTORY MUSEUM

NAHHM

Progress

 

 

 

Click here www.2-hueys.photoreflect.com to see and purchase event photos of your flight

PAGEPAGE567 PAGE568 PAGE569 PAGE570 PAGE571 PAGE572 PAGE573 PAGE574 PAGE575 PAGE576 PAGE577 PAGE578 PAGE579 PAGE580 PAGE581 PAGE582 PAGE583 PAGE584 PAGE585 PAGE586 PAGE587 PAGE588 PAGE589 PAGE590 PAGE591 PAGE592 PAGE593 PAGE594 PAGE595 PAGE596 PAGE597 PAGE598 PAGE599

1.16.2023 Running the sewage line from the Living History Hangar 1.16.2023
1.16.2023 1.16.2023 Crew from GCC Steel Erectors installing wall panels
1.17.2023 1.17.2023
1.17.2023 1.17.2023
1.19.2023 1.19.2023
1.20.20233 1/20/2023
1.20.2023 1.20.2023
1.23.2023 1.23.2023
1.26.2023 First window is installed! Thank You Harris Glass! 1.26.2023
1.26.2023 View from the second floor mezanine. 1.26.2023 Nothing like working in the snow, INSIDE the building!
1.27.2023 1.27.2023
1.27.2023 Lots of window frames! 1.28.2023
1.30.2023 1.30.2023
1.30.2023 1.30.2023
1.30.2023 1.30.2023 More windows in!
1.30.2023 1.30.2023 Metal rebar is down. Ready to lay down the lines for the heated floor system.
1.31.2023 Lots going on today! 1.31.2023
1.31.2023 Peru Utilities marking the electrical path 1.31.2023

EPAGE567 PAGE568 PAGE569 PAGE570 PAGE571 PAGE572 PAGE573 PAGE574 PAGE575 PAGE576 PAGE577 PAGE578 PAGE579 PAGE580 PAGE581 PAGE582 PAGE583 PAGE584 PAGE585 PAGE586 PAGE587 PAGE588 PAGE589 PAGE590 PAGE591 PAGE592 PAGE593 PAGE594 PAGE595 PAGE596 PAGE597 PAGE598 PAGE599