January 1 to 15 NATIONAL AMERICAN HUEY HISTORY MUSEUM NAHHM Progress
|
Click here www.2-hueys.photoreflect.com to see and purchase event photos of your flight
PAGEPAGE567 PAGE568 PAGE569 PAGE570 PAGE571 PAGE572 PAGE573 PAGE574 PAGE575 PAGE576 PAGE577 PAGE578 PAGE579 PAGE580 PAGE581 PAGE582 PAGE583 PAGE584 PAGE585 PAGE586 PAGE587 PAGE588 PAGE589 PAGE590 PAGE591 PAGE592 PAGE593 PAGE594 PAGE595 PAGE596 PAGE597 PAGE598 PAGE599
![]() |
![]() |
Guage for the heated floor in the Living History Hangar. 1.4.2023 | GCC Steel crew putting up steel wall panels 1.4.2023 |
![]() |
![]() |
AAA Concrete crew getting the area prepped and ready for concrete. 1.4.2023 | Johnny from AAA Concrete prepping the area for concrete. 1.4.2023 |
![]() |
![]() |
GCC Steel crew installing wall panels. 1.4.2023 | Ready to pour concrete. 1.4.2023 |
![]() |
![]() |
GCC Steel Erectors installing a steel beam in the tower. 1.5.2023 | GCC Steel Erectors 1.5.2023 |
![]() |
![]() |
GCC Steel Erectors welding a beam in the tower. 1.5.2023 | 1.6.20023 |
![]() |
![]() |
1.6.2023 | Dylan Gordon running the crane. 1.6.2023 |
![]() |
![]() |
1.6.2023 | 1.6.2023 |
![]() |
![]() |
Cutting the steel floor panels. 1.9.2023 | Adam Jones, GCC Steel Erectors, bolting on a steel beam. 1.9.2023 |
![]() |
![]() |
Inside the ground level of the tower. 1.9.2023 | 1.9.2023 |
![]() |
![]() |
Heated floor in the Living History Hangar before concrete. 1.9.2023 | 1.9.2023 |
![]() |
![]() |
Concrete forms are all set. 1.10.2023 | Aaron & Johnny build the concrete form for the electrical box. 1.10.2023 |
8:10 a.m. - Boom truck is here. Waiting on the first concrete truck to arrive, 1.11.2023 | Concrete boom truck. This thing is awesome! 1.11.2023 |
Truck #1. 1.11.2023 | Crew members from Bryndaw Concrete & AAA Concrete are working together to get this pour done. It was a 17 man job moving all this concrete around. Thank You Gentlemen! 1.11.2023 |
1.11.2023 | 1.11.2023 |
This is Kyle, He runs the pumper truck with a control box he wears around his waist. He is a master. 1.11.2023 | 1.11.2023 |
Brady Saylor, AAA Concrete & Excavation 1.11.2023 | GCC Steel Erectors installing white steel walls. 1.11.2023 |
1.11.2023 | 1.11.2023 |
1.11.2023 | Dylan Marburger, Bryndaw Concrete, manning the concrete. 1.11.2023 |
1.11.2023 | Brady Saylor & Wayne Houlihan 1.11.2023 |
1.11.2023 | Long distance floating. 1.11.2023 |
![]() |
|
1.11.2023 | 1.11.2023 |
![]() |
![]() |
Concrete zamboni 1.11.2023 | Brady Saylor 1.11.2023 |
![]() |
![]() |
1.11.2023 | The crew finally finished about 8:30 p.m. It was a long day. 1.11.2023 |
![]() |
![]() |
1.12.2023 | The GCC crew putting up the wall perlins. 1.12.2023 |
![]() |
![]() |
AAA concrete removing the concrete forms. 1/13/2023 | GCC Steel Erector crew drilling holes in the new floor. 1.13.2023 |