Storage Building Site & Building going up April 3 to April 8
|
![]() |
Aerial view of the property before the storage building went up |
April 8th - Amish crew getting ready to get started. |
Drilling the first hole for the 6x6 posts. |
Holes are all dug. ready to start setting posts. |
|
They drop a concrete"cookie" in the bottom of each hole. |
|
|
|
They made quick work of setting all the posts. |
|
Semi carrying the trusses coming up the drive. |
|
Driver carefully dumping the trusses on the ground. |
Posts are ready to be set. |
Tying the posts together |
Checking for level. |
![]() |
![]() |
April 9th - Frame work is up. Ready for trusses | April 9th |
![]() |
![]() |
April 13th - The metal roof panel arrive. | Unloading the roof panels. |
![]() |
![]() |
The first truss goes up. | |
April 14th | April 14th |
![]() |
![]() |
April 14th - All the trusses are installed. | |
![]() |
![]() |
April 15th - lean-to shed is added to the south east corner of the building. | |
![]() |
![]() |
April 16th - The metal roof is started. | April 16th |
![]() |
![]() |
High winds stopped the roofing for a few days | April 20th - Roofs on. |